Hi,
I have a requirement where user needs to make changes in the way data is sorted, hide few records etc in SSRS 2008. These changes would change data in some of the database tables.The changes may or may not have to be implemented from the present day but could be scheduled for a later day as well.
A preview report in excel is required to be generated after the changes have been made.
In this case I would not be able to use the same database tables for preview as normal report tables. Is it advisable to go for a full DB copy (refresh it on preview request) for preview reports. Or would it be better to take a copy of the tables affected in the same DB.
Its all a very scenario specific question, but any thoughts would be helpful!
Thanks.
Shweta
Thanks, S